Harmon Hotel Demolition is Complete: Chronology of an Epic Las Vegas Fiasco

Annotation by Deane Barker

During the late stages of construction, a Vegas hotel was found to have an engineering defect that could not be repaired. It was a total loss, but could not be imploded. It had to be dismantled, floor by floor.

This is item #276 in a sequence of 615 items.

You can use your left/right arrow keys to navigate